| 1 | Guidelines on changes in the scope of projects for granting revised administrative approval to water resources projects - June 10, 2013 | |
| 2 | Maximization of available materials and cost savings in the project while designing cross-sections for earth filling - May 2, 2011 | |
| 3 | Identification of suitable locations for constructing Kolhapur-type weirs, low-level and high-level weirs and upstream ponding effect for the weirs - June 4, 2014 | |
| 4 | Guidelines regarding the design and blueprints for projects entrusted to the Design Organization - January 16, 2015 | |
| 5 | Conducting technical scrutiny & inspection of the works undertaken by WRD - July 25, 2016 | |
| 6 | Conceptual shift in the thinking within the Water Resources Department 23 June 2020 | |
| 7 | Standardization of Design Note On Flood Protection Wall - 11 December 24 | |
| 8 | Regarding the use of artificial sand in government construction - 11 August 2020 | |
| 9 | Procedure for passing the foundations of Irrigation Projects - 15 October 2001 | |
| 10 | Regarding the revision of rates for consultancy works inspection works and visit fees | |
| 11 | Measures to be taken regarding dam gates and malfunctioning equipment 31 Dec 2015 | |
| 12 | Precautions to be taken while carrying out project construction at the regional level 28 May 2009 | |
| 13 | Adoption of Innovative Technology in the Water Resources Department 18 July 2023 | |
| 14 | Circular regarding the Feasibility of Earth Dam Cross-sections, dated July 30, 2009. | |
| 15 | Circular dated 22/08/2008 regarding the approval of the General Plan for Minor Irrigation Schemes. | |
| 16 | Guidelines For Design Of MI Tank Dt. 05/05/2008 | |
| 17 | Circular regarding the Feasibility of Earth Dam Cross-sections, dated 22/02/2007. | |
| 18 | Government Resolution dated 02/12/2004 regarding the Sanctioning Authority for Minimum Project Estimates for Major, Medium, and Minor Irrigation Schemes. | |
| 19 | Dam Foundation: Foundation Schedule. 15/10/2001 | |
| 20 | Procedure for passing foundation of minor & medium irrigation projects Dt.15/10/2001 | |
| 21 | Design works carried out at CDO Circlular Dt.14/08/2001 | |
| 22 | Utility Circular No. dated 29/09/2001 - For Administrative Approval | |
| 23 | COT Circular for MI Tank Dt. 17/04/1989 | |
| 24 | Scrutiny of Design of Dam Dt.04/04/1984 | |
| 25 | Proposal regarding Leakage and Repairs of Minor Irrigation Projects - Dated 15/02/2003 | |
| 26 | Regarding the Control of Potential Increases in the Budget Estimates for Administrative Approvals of Projects - Dated 10/08/2011 | |
| 27 | Sample Quantity and Handling Precautions for Soil Retention and Cut-off Wall Concepts (for Quality Assessment) | |
| 28 | Design flood for MI works in Konkan Region Date. 27/07/1966 | |
| 29 | Flood discharge for M.I Wroks with C.A less than 20 Sq.miles Dt.20/08/1953 | |
| 30 | Minor Irrigation Schemes in Western Maharashtra - Spillway Design Concept Maximum Full Discharge Dated February 2, 1991 |