• A
  • A+
  • A-
Opening times
Mon - Sat: 7.00 - 18:00

GR and Circulars Earth Dam

Sr.No. Subject View/Download
1 Guidelines on changes in the scope of projects for granting revised administrative approval to water resources projects - June 10, 2013
PDF Icon 978.82 KB
2 Maximization of available materials and cost savings in the project while designing cross-sections for earth filling - May 2, 2011
PDF Icon 1012.26 KB
3 Identification of suitable locations for constructing Kolhapur-type weirs, low-level and high-level weirs and upstream ponding effect for the weirs - June 4, 2014
PDF Icon 151.22 KB
4 Guidelines regarding the design and blueprints for projects entrusted to the Design Organization - January 16, 2015
PDF Icon 170.91 KB
5 Conducting technical scrutiny & inspection of the works undertaken by WRD - July 25, 2016
PDF Icon 151.55 KB
6 Conceptual shift in the thinking within the Water Resources Department 23 June 2020
PDF Icon 3.09 MB
7 Standardization of Design Note On Flood Protection Wall - 11 December 24
PDF Icon 2.83 MB
8 Regarding the use of artificial sand in government construction - 11 August 2020
PDF Icon 1.23 MB
9 Procedure for passing the foundations of Irrigation Projects - 15 October 2001
PDF Icon 1.12 MB
10 Regarding the revision of rates for consultancy works inspection works and visit fees
PDF Icon 1.26 MB
11 Measures to be taken regarding dam gates and malfunctioning equipment 31 Dec 2015
PDF Icon 1.51 MB
12 Precautions to be taken while carrying out project construction at the regional level 28 May 2009
PDF Icon 744.43 KB
13 Adoption of Innovative Technology in the Water Resources Department 18 July 2023
PDF Icon 172.73 KB
14 Circular regarding the Feasibility of Earth Dam Cross-sections, dated July 30, 2009.
PDF Icon 1017.96 KB
15 Circular dated 22/08/2008 regarding the approval of the General Plan for Minor Irrigation Schemes.
PDF Icon 1 MB
16 Guidelines For Design Of MI Tank Dt. 05/05/2008
PDF Icon 1.23 MB
17 Circular regarding the Feasibility of Earth Dam Cross-sections, dated 22/02/2007.
PDF Icon 1.1 MB
18 Government Resolution dated 02/12/2004 regarding the Sanctioning Authority for Minimum Project Estimates for Major, Medium, and Minor Irrigation Schemes.
PDF Icon 498.78 KB
19 Dam Foundation: Foundation Schedule. 15/10/2001
PDF Icon 3.19 MB
20 Procedure for passing foundation of minor & medium irrigation projects Dt.15/10/2001
PDF Icon 2.61 MB
21 Design works carried out at CDO Circlular Dt.14/08/2001
PDF Icon 1.08 MB
22 Utility Circular No. dated 29/09/2001 - For Administrative Approval
PDF Icon 840.64 KB
23 COT Circular for MI Tank Dt. 17/04/1989
PDF Icon 3.95 MB
24 Scrutiny of Design of Dam Dt.04/04/1984
PDF Icon 791.89 KB
25 Proposal regarding Leakage and Repairs of Minor Irrigation Projects - Dated 15/02/2003
PDF Icon 534.38 KB
26 Regarding the Control of Potential Increases in the Budget Estimates for Administrative Approvals of Projects - Dated 10/08/2011
PDF Icon 1.79 MB
27 Sample Quantity and Handling Precautions for Soil Retention and Cut-off Wall Concepts (for Quality Assessment)
PDF Icon 1.88 MB
28 Design flood for MI works in Konkan Region Date. 27/07/1966
PDF Icon 1.25 MB
29 Flood discharge for M.I Wroks with C.A less than 20 Sq.miles Dt.20/08/1953
PDF Icon 1.38 MB
30 Minor Irrigation Schemes in Western Maharashtra - Spillway Design Concept Maximum Full Discharge Dated February 2, 1991
PDF Icon 1.12 MB


Last Modified on:20 December 2024