General information
The said division is into existence since April 1959. This division deals with the problems faced by the Maharashtra Government in the construction work. Hence research work is carried out by the said division to find the solutions on the problems faced by the people working on the construction site. The laboratory tests are carried out in this division for new technology-based construction instruments as well as techniques and research work are being carried out so as to make the site work easier.
ACTIVITIES
Testing work
SR. NO. |
MATERIALS |
1 |
Cement (Physical and Chemical test) |
2 |
Coarse Aggregate |
3 |
Fine Aggregate |
4 |
Mortar |
5 |
Concrete |
6 |
Large size cores (0.90m diameter) |
7 |
Fly ash / Surkhi (Physical and Chemical test) |
8 |
R.C.C. Pipes |
9 |
A.C. Pipes |
10 |
A.C. Sheets |
11 |
Metals |
12 |
Bricks |
13 |
Mangalore Tiles |
14 |
Flooring Tiles |
15 |
Glazed Tiles |
16 |
Timber |
17 |
Hollow Blocks |
18 |
Lime |
19 |
Leeached material |
20 |
Seepage water |
21 |
T.C.L.Powder |
22 |
Calibration |
23 |
Sand and gravels |
24 |
Alum |
25 |
Soil |
26 |
FRP Needle |
27 |
Paver block |
Annual Research Program 2024
Sr.No. |
NAME OF RESEARCH PROBLEMS |
1 |
Compatibility of Chemical admixture with Cement. (Part II) |
2 |
Use Of Steel Fiber in concrete. |
3 |
Study of Use of Glass Powder in Concrete. |
4 |
Study of leakages proofing (Chemical) material available in market to avoid leaching through various dam in Maharashtra. |
5 |
Study to calculate the quantity of cement in leaching material through various dams in Maharashtra. |
6 |
Ferro cement technique in construction by using gunniting and other mechanical work. |
7 |
To Study the durability test of P.P.C and O.P.C |
TARGET ACHIEVE D IN LAST FIVE YEARS (TESTING & REVENUE)
Sr. No |
Year
|
Work Done |
Revenue Earned in Lakhs |
|||
No. of Samples |
No. of Tests |
Govt. |
Pvt. |
Total |
||
1 |
2015 - 2016 |
664 |
2871 |
39.23 |
5.78 |
45.01 |
2 |
2016 - 2017 |
607 |
3109 |
53.95 |
5.73 |
59.68 |
3 |
2017 - 2018 |
652 |
3347 |
69.23 |
4.77 |
74.00 |
4 |
2018 -2019 |
1014 |
5248 |
103.47 |
6.07 |
109.54 |
5 |
2019-2020 |
1001 |
4575 |
116.72 |
12.91 |
129.64 |
6 |
2020-2021 |
778 |
3551 |
99.11 |
7.22 |
106.34 |
SPECIAL WORK
Test Performed:
Testing Of Fiber Reinforced Plate (FRP).
The agency provided plates of 5-ton, 6 Ton etc. capacity. As per the directives given by higher officials the two types of loads were applied. Uniformly distributed load and Point load at the center of the plate. The agencies are as follows
B.I.S. Committee
Scientific Research officer, Material Testing Referral Lab is the Member of following committees of B.I.S., New Delhi.
Sr. No. |
Committee Number |
Name of committee |
1 |
CED 2:1 |
Cement, Pozzolana & Cement additives Sub sectional Committee. |
2 |
CED 53 |
Concrete Pipe Committee |
6. Handbooks prepared under MERI circle, Nashik Institute