A PHP Error was encountered

Severity: Notice

Message: Trying to get property 'menu_page_description' of non-object

Filename: controllers/ViewContent.php

Line Number: 510

Backtrace:

File: /home/dgmeriwrd/public_html/HP/application/controllers/ViewContent.php
Line: 510
Function: _error_handler

File: /home/dgmeriwrd/public_html/HP/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Trying to get property 'menu_page_keywords' of non-object

Filename: controllers/ViewContent.php

Line Number: 511

Backtrace:

File: /home/dgmeriwrd/public_html/HP/application/controllers/ViewContent.php
Line: 511
Function: _error_handler

File: /home/dgmeriwrd/public_html/HP/index.php
Line: 315
Function: require_once

HP - Welcome to Hydrology Project (Surface Water-SW) & Dam Safety, Maharashtra State. Under National Hydrology Project
image
Opening times
Mon - Sat: 7.00 - 18:00

Welcome to Hydrology Project (Surface Water-SW) & Dam Safety, Maharashtra State.

SOIL MECHANICS REFERAL LABORATORY

 

Name:Shri. Digmbar D. Parkhe
Designation:Scientific Research Officer
Qualification:M.Sc Analytical Chemistry 
Phone : 91 253 2530295    Fax : 0253 2530764
Email : sro_soilmechanics@outlook.com ,srolsm.nashikwrd@maharashtra.gov.in
 

Joining Details:

?         Joined on present position on 8th Mar 2013.

?         Post Graduate from KTHMCollege in 1997.

?         Entered in the Maharashtra Engineering Research Institute (MERI) in       April-1999.

?         Worked in the capacities of Senior Scientific Assistant (Apr.1999-2005), Scientific Officer (Mar.2005-2013) and Scientific Research Officer ( March 2013 – till date).


Work Experience:

Working experience in following field :

?        Remote Sensing and GIS Technique and its Applications.

?       Chemical & Physical Properties of Cement, Fly Ash, Sand, Soil,

       Leached Material and Water.

?       Good knowledge of Computer Hardware and Software.

?        Sedimentation Survey of Reservoirs by Remote Sensing and DGPS Technique.

?       Developed an E-Library for studied reports in MERI. It is very useful to find any report and backup a hard and softcopy.

?        Worked in Material Testing Division, Soil Mechanic Division, Environmental Engineering Research Division, Structural Research & Physics Division, Remote Sensing & Geo informatics Division and Reservoir Sedimentation Survey Division.

Sample received and Testing Cycle :

?         The soil samples for testing are received by Division , through letter along with Data Sheet, Quarry map & Certificate and Soil Samples  which is certify in  presence  E. E. level in case of Deptt. and Head of organization in case of private Agency.

?         The testing work is assigned to the ARO / SO, by S.R.O.

?         The testing requirements are received by ARO / SO for carrying out necessary testing.

?         The testing requirements are verified by ARO / SO through the check list for acceptance of test job.

?         If the testing assignment is not acceptable then inform to  the concerned submission authority.

?         A Proforma Invoice for testing charges is prepared as per prevailing approved testing rates and sent to concern Organization /Agency.   
      ?         The test is performed after receipt of the necessary funds deposit to Civil Construction Maintenance  Division, MERI, Nashik., under intimation to this division.

?         Work order for testing is entrusted to staff as per chronology order of Soil samples and cheque received. (As  far as possible first come first serve basis).

?         The final test results are checked, complied by staffs, concerned ARO/SO and submitted to the SRO for final  approval. After approval, the final result sheet with final bill (part III) sent to the concerned field officer/ Authority.

List of Personnel

 

Sr.No.

Name

Designation

Qualification

1

 D.D.Parkhe

Scientific Research Officer

M.Sc.Chemistry

2

A.P.Patil

Assistant Research Officer

B.E.Civil

3

V.R.Ghane

Scientific Officer

B.Sc

4

A.P.Jadhav

Asstt. Engineer G-II

B.E.Civil

5

U.G.Fulzele

Sectional Engineer

DCE

6

K.V.Gunjal

Sectional Engineer

DCE

7

B.B Tuse 

Junior Engineer

CEA

8

A.B.Lokhande

Junior Scientific Assistant

M.Sc

9

K.M.More 

Research Assistant

M.Sc.Chemistry

10

A.K.Gaikwad 

Research Assistant

M.Sc.Agri

11

 I.A.Shaikh

Stenotypist

B.Com

12

 B.B. Ninave

Senior Clerk

S.S.C

13

 V.D.Sapkal

Junior Clerk

B.A

14

V.V.Lokhande

Junior Clerk 

12th

15

 Korale

Peon

 

16

 S.P.Bhujbal

Helper

 

17

 B.J.Ugle

CRT Mazdoor

 

18

 M.S.Lonare

CRT Mazdoor

 

19

 N.L.Waykande 

CRT Mazdoor

 

 

 

 

 

 

 

 

 

 

Completed Project Testing Work

Sr.No.

Year

Number Of Projects

No.Of Samples

1

2011-2012

48  Projects

298

2

2012-2013

40  Projects

312

3

2013-2014

56  Projects

314

4

2014-2015

39 Projects

312

5

2015-2016

50  Projects

369

6

2016-2017

47  Projects

400

7

2017-2018

41 Projects

283

 

 

 

 


Ongoing Project : (2017-2018 upto sept 17)

Sr.No.

Region

No. Of Samples

1

Kokan

19

2

TIDC,Jalgaon

04

3

Vidharbha

56

4

NMR

10

5

Marathwada

01

6

Pune

00


Ongoing Research Problems

Sr.No.

Year

Name of Problems

Status

1

 

(1) Gosi khurd project- suggestions of CNS material
    (2) Determination of relation between swelling pressure and shrinkage limit for soil
  (3) Determination of water content and dry density relation using compaction
    (4) Study of nano concrete using carbon nano tubes / polycarboxylates.
 

Ongoing

 

 

 

 


Tecnical Reports Last Five Years :

 

 

Sr,No.

Year

Name of Technical Report

1

2012- 2013

Investigation of bearing capacity of  foundation for proposed Minor Irrigation scheme Karajgaon. Tal.-Chandur-bazar. Dist.-Amravati

2

2013- 2014

Investigation of bearing capacity of  foundation for proposed Minor Irrigation scheme Naya -Andura Tal, -Balapur, Dist. - Akola

3

2014 -2015

The study of non-functioning of Toe drain in Ujjain dam, Dist.-Solapur

4

2015- 2016

1. Investigation of bearing capacity of Navegaon Minor Project, Dist.- Gondia   2. Investigation of bearing capacity for Aqueduct on left bank canal at ch.9420 M of Dehali Medium Project, Tal - Akkalkuwa, Dist-Nandurbar.
3. Study of sub soil strata in context with leakages in Lbc and Rbc of Vadivale medium project (first 6.00 km)

 



             
6

2016 -   
2017

2017-2018

1.Investigation of bearing capacity for R.C.C. E.S.R at Takli,Nashik, Dist. Nashik for Nashik Municipal Corporation, Nashik.
2. Study of structures in black cotton soil.

1. Regionwise pattern of soil properties in Maharashtra state.


Research Paper

Sr. No

Year

Name of research paper

1

2015-2016

1.Study of sand having more organic impurities
2.Establishing relationship between swelling pressure and free swell index of soils-A case study
3.Deriving soil properties pattern for kokan region in Maharashtra state.

2

2016-2017

1.Soil properties pattern of Marathwada region in Maharashtra state
2.Use of water banking concept in and as water conservation
3.Study of structure in black cotton soil
4.Compilation of plate bearing test data

3

2017-2018

1.Soil properties pattern of Nashik region in Maharashtra state
2.Remedial measures for canal leakages in Vadivale medium project,Pune,Maharashtra
3.Analysis of effect of shear wall on floor diaphragm in multi-storied reinforced concrete building
4.Investigation of bearing capacity by plate load test-A case study
5.Effect of soaking period on liquid limit and plastic limit of soils

4

2018-2019

1.Nano concrete and its classified applications in nano technology
2.Soil properties pattern of saline belt in Vidharbha region in Maharashtra state





Ongoing Research

sr.no

Year

Name of research paper

1

2018-2019

1. Nano concrete and its classified applications in nano technology
2. Soil properties pattern of vidharbha region in Maharashtra state
3. Applications of ferrocement in construction.
 





Revenue Earned :

Sr. No.

Year

Revenue Earned in Lakhs

 

 

 

 

Government

Private

Total

1

2011-2012

27.225

0

27.22

2

2012-2013

111.80

9.00

120.80

3

2013-2014

54.66

9.08

63.74

4

2014-2015

25.86

2.96

28.82

5

2015-2016

68.39

8.88

77.27

6

2016-2017

43.63

10.09

53.72

7

2017-2018
 

28.65

0.022

28.672