General Information about Network & Structure of RTDAS for Krishna-Bhima Basin - A Pilot Project

RTDAS Structure 

Real Time Data Acquisition System works in following three steps:

 

Data Collection Platform (DCP):

This is the platform where the sensors are mounted. The DCP supplies power to various sensors, charges the battery using solar panels, stores the data in the data logger and provides protection to equipment from dust, water and theft. Most stations in a real-time network are required to run on battery power packs with solar charging since there might not be any power connections.

 

Telemetry Device:

This device receives the data from the DCP (data logger) and transmits them to data centres via an appropriate telemetry method. The telemetry proposed under the project is based on technologies such as the Global System for Mobile (GSM)/ General Packet Radio Service (GPRS), Indian National Satellite System (INSAT) and Very Small Aperture Terminal (VSAT).

 

Database Management System:

This system is installed at the data centre, Pune and receives the data from the telemetry device. The data are then checked for quality and consistency, stored in a structured format, and made available to stakeholders by different means. This data is made available to all stakeholders on project website; http://www.rtsfros.com/mahakrishna at Real time data menu.

 

Diagram showing RTDAS Structure

 

 

 

RTDAS Network in Krishna and Bhima basin        

 

Sr No

Description

Number of stations under             HP-II

1

Automated Rainfall Stations (ARS)

149

2

Automated Full Climate Stations (AWS)

42

3

Automated River water Level and River Discharge Stations (ARWL and RDS)

31

4

Automated Reservoir  water Level and outflow Discharge Stations                    (ARWL and ODS)

46

5

Gate Sensors on Dam

175 (26 Dam)

6

Automated Reservoir Canal Level & Canal Discharge Stations - ACWL and CDS

7

 

 

 

Name of Reservoir in RTDAS, installed with Gate Sensors

 

Sr

No

Reservoir

No of Gates/

Sensors

Sr

No

Reservoir

No of Gates/

Sensors

1

Radhanagari

7

14

Wadaj

5

2

Dhom Balkawadi

3

15

Dimbe

5

3

Warna

4

16

Chaskaman

5

4

Ujjani

41

17

Wadiwale

5

5

Khadakwasala

11

18

Pawana

6

6

Vir

9

19

Yedgaon

11

7

Kanher

4

20

Kasari

3

8

Urmodi

4

21

Panshet

4

9

Kumbhi

3

22

Bhama Askheda

4

10

Dudhganga

5

23

Koyana

6

11

Manikdoh

5

24

Dhom

5

12

Warasgaon

5

25

Uttarmand

3

13

Nira Deoghar

5

26

Mulshi

7

 

 

 

 

Total

175

 