English
Marathi
A
A+
A-
Services
Opening times
Mon - Sat: 7.00 - 18:00
Home
HP
General Information of HP
Objectives of HP
Work Profile of HP
Organisation Chart of HP
Contact Us
KWDT
SDSO
About SDSO
Objective
General Information
Work Profile
Organisation Chart
Contact us
Dam Safety
DSA-2021
Specified Dam
Status
Inspection
Premonsoon
Post-Monsoon
Instrumentation
Dam Instrument
Seismological Instrument
Hydro metrological Instrument
Logbook
Documentation
Emergency Action Plan (EAP)
Operation and Maintenance (O&M)
Comprehensive Dam Safety Evolution (CDSE)
Risk Assessment Studies(RAS)
Canal Safety
Status
Canal Database
Inspection
External Aided Project
DRIP-II&III
Financial Status
Physical Status
Publications
Annual Reports
Dams Reports
Health Status Report Maharashtra State
Corporation wise Health Status Report
Canal Reports
Canal Network Status Report
Corporation wise Status Report
References
Dams
Acts & GR
Guidelines
National Register of Large Dams 2023
Canal
Acts & GR
Canal Safety Manuals
DRIP II&III
Acts & GR
Standard Formats
Emergency Action Plan (EAP) Proforma
Operation and Maintenance (O&M) Proforma
Standard CWC-Checklist for Inspection of dams
Instrumentation Proforma
Logbook Proforma
Form of Annual Inspection of Canal Network
HIS
Hydrological Information System Structure
Hydrological Information System Network
Basin Maps
HDUG and Data Dissemination
Introduction
Membership
User Guide
Payment Information
Data Availability Conventional
Data Policy & Dissemination Process
Dissemination Policy
Dissemination Process
Water Quality
WQ Labs in Maharashtra
WQ Parameters
Introduction
WQ Data Availability
Data Availability Krishna Bhima RTDAS
HDUG List
NHP
Background
Aims & Objectives
Roles of HP
Training and Events
NHP Management SPMU
RTDAS
Brief on RTDAS
Introduction
RTDAS Equipments
Krishna-Bhima Real Time Data Support System - RTDSS
Network And Structure
Real Time Stream Forecasting & Reservoir Operation System - RTSF & ROS
Krishna-Bhima Pilot Project
Proposed RTDAS in Maharashtra
Introduction to RTDAS in NHP
Network and Structure
Daily Data
Daily Rainfall (Conventional)
Daily Rivergauge (Conventional)
Dam Storage Data
Water Availability & Study Report
Water Availability Certificate
Certificate
Current Staticstics
Procedure & Drafts
Flood Study Report
Cheklist for flood study
Current Staticstics
Procedure & Drafts
Back Water Study
Check list
Backwater G.R.
Procedure & Drafts
photo 2024
India WRIS SWIC
Contact us
Institutes
Director General Office
Maharashtra Engineering Research Institute (MERI)
Maharashtra Engineering Training Academy (META)
Hydrology Project and Dam Safety(HP)
Central Design Organisation (CDO)
State Level Technical Advisory Committee (SLTAC)
2
x
Boskke Cube
1 ×
$39.00
x
Cast Iron Casserole
1 ×
$230.00
Subtotal:
$269.00
View cart
Checkout
Home
Inspection
Canal Database
Inspection
Inspection
Casting of Canal Inspection Status is under process.
Last Modified on: 06 March 2025